SFI SYSTEM > ECM Power Source Circuit |

| 1.INSPECT INTEGRATION NO.1 RELAY (POWER SOURCE) |
![]() |
Remove the integration relay from the engine room relay block.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1A-1 - Body ground | Always | 11 to 14 V |
| *1 | Front view of wire harness connector: (to Integration Relay) |
Reinstall the integration relay.
|
| ||||
| OK | |
| 2.INSPECT INTEGRATION NO.1 RELAY (EFI RELAY AND IG2 RELAY) |
![]() |
Remove the integration relay from the engine room relay block.
Inspect the relay
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1A-1 - 1B-4 or 1B-10 | When battery voltage absent | 10 kΩ or higher |
| When battery voltage applied to terminals 1B-2 and 1C-3 | Below 1 Ω | |
| 1A-1 - 1B-7 | When battery voltage absent | 10 kΩ or higher |
| When battery voltage applied to terminals 1C-3 and 1D-11 | Below 1 Ω |
| *1 | Front view of wire harness connector: (to Integration Relay) |
Reinstall the integration relay.
|
| ||||
| OK | |
| 3.CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - ECM) |
![]() |
Remove the integration relay from the engine room relay block.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A18-44 (MREL) - 1B-2 | Always | Below 1 Ω |
| A18-2 (+B) - 1B-10 | Always | Below 1 Ω |
| A18-1 (+B2) - 1B-4 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| A18-44 (MREL) or 1B-2 - Body ground | Always | 10 kΩ or higher |
| A18-2 (+B) or 1B-10 - Body ground | Always | 10 kΩ or higher |
| A18-1 (+B2) or 1B-4 - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector: (to Integration Relay) |
| *2 | Front view of wire harness connector: (to ECM) |
Reinstall the integration relay.
Reconnect the ECM connector.
|
| ||||
| OK | |
| 4.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND) |
![]() |
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| B8-105 (E1) - Body ground | Always | Below 1 Ω |
| *1 | Front view of wire harness connector: (to ECM) |
Reconnect the ECM connector.
|
| ||||
| OK | |
| 5.INSPECT ECM (IGSW TERMINAL VOLTAGE) |
![]() |
Disconnect the ECM connectors.
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| A18-27 (IGSW) - B8-105 (E1) | Ignition switch ON | 11 to 14 V |
Reconnect the ECM connectors.
| Result | Proceed to |
| Outside standard range | A |
| Within standard range | B |
| *1 | Front view of wire harness connector: (to ECM) |
| *2 | Front view of wire harness connector: (to ECM) |
|
| ||||
| A | |
| 6.CHECK HARNESS AND CONNECTOR (ECM - INTEGRATION RELAY) |
![]() |
Remove the integration relay from the engine room relay block.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A18-27 (IGSW) - 1B-7 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| A18-27 (IGSW) or 1B-7 - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector: (to Integration Relay) |
| *2 | Front view of wire harness connector: (to ECM) |
Reinstall the integration relay.
Reconnect the ECM connector.
| Result | Proceed to |
| Outside normal range | A |
| Within normal range (w/ Entry and Start System) | B |
| Within normal range (w/o Entry and Start System) | C |
|
| ||||
|
| ||||
| A | ||
| ||
| 7.CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - POWER MANAGEMENT CONTROL ECU - BODY GROUND) |
![]() |
Remove the integration relay from the engine room relay block.
Disconnect the power management control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1D-11 - D36-8 (IG2D) | Always | Below 1 Ω |
| 1C-3 - Body ground | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| 1D-11 or D36-8 (IG2D) - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector: (to Integration Relay) |
| *2 | Front view of wire harness connector: (to Integration Relay) |
| *3 | Front view of wire harness connector: (to Power Management Control ECU) |
Reinstall the integration relay.
Reconnect power management control ECU connector.
|
| ||||
| OK | ||
| ||
| 8.CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - IGNITION SWITCH - BODY GROUND) |
![]() |
Remove the integration relay from the engine room relay block.
Disconnect the ignition switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1D-11 - D28-6 (IG2) | Always | Below 1 Ω |
| 1C-3 - Body ground | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| 1D-11 or D28-6 (IG2) - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector: (to Integration Relay) |
| *2 | Front view of wire harness connector: (to Integration Relay) |
| *3 | Front view of wire harness connector: (to Ignition Switch Assembly) |
Reinstall the integration relay.
Reconnect the ignition switch assembly connector.
|
| ||||
| OK | |
| 9.INSPECT IGNITION SWITCH ASSEMBLY |
![]() |
Remove the ignition assembly switch.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| - | LOCK | 10 kΩ or higher |
| 2 - 3 | ACC | Below 1 Ω |
| 2 - 3- 4 | ON | |
| 6 - 7 | ||
| 1 - 2- 4 | START | |
| 6 - 7 - 8 |
Reinstall the ignition switch assembly.
|
| ||||
| OK | ||
| ||